Alliant Power New Injector - Ford 7.3L Powerstroke - 1999-2003 - Long Lead
LONG LEAD (LL or Blue Harness Connector)
Used in #8 Cylinder to eliminate "cackle" per Ford Bulletins 00-10-1, 00-22-1, and 01-14-6
Description
Alliant Power OE New HEUI Fuel Injector for 1999.5-2003 Ford 7.3L PowerStroke & Navistar T444E Engines
Since 2001 Alliant Power has been the original aftermarket source of genuine OE New HEUI fuel injectors for the 7.3L Ford PowerStroke & Navistar T444E and to this day, we continue that legacy. Built in the OE facility to the newest design and engineering requirements, the Alliant Power Reman injectors deliver like new performance.
Feature and Benefits:
- 100% New Injector
- Injectors receive any number of updates that have been developed since the original design
- 100% end of line tested for fuel delivery, timing, peak injection and assembly leakage
In the Box:
- (1) New HEUI Fuel Injector
- (3) Injector body o-rings (installed)
- (1) Cushing Ring (installed)
- (1) Nozzle Tip Chamber Gasket
Fitment: Note- Prime (Split Shot) Injector for Engines built AFTER 12/07/1998
About Alliant Power:
With a legacy spanning decades, Alliant Power has emerged as a trusted and leading brand, dedicated to delivering innovative and reliable products to meet the diverse needs of customers worldwide. Whether it's agriculture, construction, transportation, or industrial applications, our commitment to excellence ensures that our customers receive the highest quality power solutions that they can rely on, day in and day out.
Alliant Power takes pride in our customer-centric approach. We prioritize building long-term relationships with our customers by providing unmatched technical support, personalized service, and prompt assistance. Our commitment to customer satisfaction is at the core of everything we do, enabling us to be a reliable partner in powering their success. As a global brand, Alliant Power has a widespread presence, serving customers across the globe. Our distribution network ensures that our products are readily available and easily accessible, making it convenient for customers to find the power solutions they need, wherever they may be.
Details
- AP63804AE
- AP63804AE
- Alliant Power
- New
Categories
Shipping Information
- Item Requires Shipping
- 1.0 lbs.
- W8.0000” x H2.0000” x L2.0000”
- Free Shipping - Ground
Customer Reviews
Total Reviews (0)
You must login to post a review.

Write the First Review!